Sunday, December 8, 2019

A Case Study of Kitchen Refurbishment by Carillion FM Free Sample

Question: Discuss about the Case Study of Kitchen Refurbishment by Carllion FM. Answer: Assumptions for the project This project is focused on the refurbishment of kitchen of a property to a modern standard and redecorating the interiors. Carillion FM has undertaken this project after the site visit and assessment of the existing structure, finishing and services. However, some assumptions have been made to ensure success of the project as listed below: The materials that will be procured for required installation and repairing must be of high quality. The design of the project must be compatible in context to architectural point of view. The remodeling of kitchen must be done such that it meets the construction, codes and standards for fire and safety. There must be access to drainage so that servicing and installations of updated systems can be carried out efficiently. The completion of the project will ensure that the property can be used for accommodation of family. Programme for the project in Microsoft project Timeline for the project WBS Task Name Duration Start Finish Predecessors Resource Names 0 Refurbishment of kitchen to a modern standard 107 days Mon 1/23/17 Tue 6/20/17 1 Project Startup 1 day Tue 4/4/17 Tue 4/4/17 Project Manager 2 Demolishing and Fabrication works 55 days Wed 4/5/17 Tue 6/20/17 2.1 Removal of lathe, plaster wall and ceiling 7 days Wed 4/5/17 Thu 4/13/17 1 General Trades for demolition and cleaning 2.2 Plastering and lining up ceiling with plasterboard and skimmed 5 days Fri 4/14/17 Thu 4/20/17 3 Plasterer 2.3 New partition with 75mm timber stud wall having both sides plasterboard 4 days Fri 4/21/17 Wed 4/26/17 4 Plasterer 2.4 Trimming of study ceiling 3 days Thu 4/27/17 Mon 5/1/17 5 General Trades for demolition and cleaning 2.5 Installation of new study door 2 days Tue 5/2/17 Wed 5/3/17 6 Decorator 2.6 Floor Layout 14 days Thu 5/4/17 Tue 5/23/17 2.6.1 Floor covering with Karndean vinyl tiles 3 days Thu 5/4/17 Mon 5/8/17 7 Floor Layer 2.6.2 Two coats of protective varnish on tiles 2 days Thu 5/18/17 Fri 5/19/17 9FS+7 days Floor Layer 2.6.3 Laying of 12mm plywood over the whole kitchen area 2 days Mon 5/22/17 Tue 5/23/17 10 Floor Layer 2.7 Fitting of new skirting boards in kitchen 3 days Wed 5/24/17 Fri 5/26/17 11 Floor Layer 2.8 Trimming and refixing of skirting boards in study 1 day Mon 5/29/17 Mon 5/29/17 12 Floor Layer 2.9 2 coats emulsion paint on walls and ceiling of both kitchen and study 2 days Tue 5/30/17 Wed 5/31/17 13 Floor Layer, Plasterer 2.10 Gloss painting in skirting boards, door frames, doors and window boards 2 days Thu 6/1/17 Fri 6/2/17 14 Plasterer 2.11 Fitting of ceramic tiles on back wall of sink and cooker 2 days Mon 6/5/17 Tue 6/6/17 15 Floor Layer 2.12 Application of new ceiling coving to the kitchen and study 3 days Wed 6/7/17 Fri 6/9/17 16 Plasterer 2.13 Fittings of lighting in kitchen and study 1 day Mon 6/12/17 Mon 6/12/17 17 Electrician 2.14 Redecorating interior of the house 3 days Tue 6/13/17 Thu 6/15/17 18 Decorator 2.15 2 coats emulsion to walls and ceilings, gloss paint doors and other woodwork 2 days Fri 6/16/17 Mon 6/19/17 19 Decorator 2.16 Final cleaning 1 day Tue 6/20/17 Tue 6/20/17 20 General Trades for demolition and cleaning 3 Installation works 55 days Mon 1/23/17 Fri 4/7/17 3.1 Delivery of components to the site 1 day Fri 3/31/17 Sat 4/1/17 27SF-3 edays Carpenter, Project Manager 3.2 Marking up the locations of various points 1 day Mon 3/13/17 Tue 3/14/17 27SF-3 ewks Fitter 3.3 Confirmation on installation of points in correct locations 1 day Mon 3/27/17 Tue 3/28/17 27SF-1 ewk Company Fitter 3.4 Sign-off by kitchen company before installation date 1 day Mon 1/23/17 Tue 1/24/17 27SF-10 ewks Company Fitter 3.5 Begin installation 4 days Tue 4/4/17 Fri 4/7/17 Company Fitter, Fitter, Gas Engineer, Plumber 4 Notification to tenants 1 day Mon 4/10/17 Mon 4/10/17 27 Project Manager 5 Moving in to the accommodation 1 day Tue 4/11/17 Tue 4/11/17 28 Project Manager 6 Project Closeout 0 days Tue 4/11/17 Tue 4/11/17 29 Project Manager Cost for resources Resource Name Type Initials Max. Units Std. Rate Accrue At Base Calendar Decorator Work DC 200% $45.00/hr Prorated Standard Electrician Work EC 200% $35.00/hr Prorated Standard Plumber Work PB 200% $30.00/hr Prorated Standard Gas Engineer Work GE 100% $40.00/hr Prorated Standard Carpenter Work CP 100% $30.00/hr Prorated Standard Plasterer Work PL 100% $35.00/hr Prorated Standard General Trades for demolition and cleaning Work GTC 200% $25.00/hr Prorated Standard Floor Layer Work FL 100% $30.00/hr Prorated Standard Bibliography Burke, R., 2013. Project management: planning and control techniques.New Jersey, USA. Heagney, J., 2016.Fundamentals of project management. AMACOM Div American Mgmt Assn. Hill, G.M., 2013.The complete project management office handbook. CRC Press. Kerzner, H., 2013.Project management: a systems approach to planning, scheduling, and controlling. John Wiley Sons. Lock, M.D., 2014.The essentials of project management. Ashgate Publishing, Ltd.. Martinelli, R.J. and Milosevic, D.Z., 2016.Project management toolbox: tools and techniques for the practicing project manager. John Wiley Sons. Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success.International Journal of Project Management,32(2), pp.202-217. Newton, R., 2016.Project management step by step: how to plan and manage a highly successful project. Pearson UK. Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual framework for project governance.International Journal of Project Management,32(8), pp.1382-1394. Turner, R., 2016.Gower handbook of project management. Routledge.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.